 
        
        
      
    
    For builders
Be A Network Builder
- Freedom to pick and choose the jobs you want 
- Your own contract with the client for the agreed level of work that suits you both 
- Less scheduling involved, just turn up and start work 
- Customkit is responsible for the kit being delivered to site (including transport insurance) 
- Our Production Manager and design team are all in house so are available to answer any questions quickly and efficiently throughout the entire build 
Need To Know
- We take care of the design, engineering and consenting process 
- Once the building consent has been approved the kit generally takes approximately 8 weeks to prepare 
- Kit delivered to site by Hiab (for easy unloading) on an agreed date or dates, staged according to the project, based upon your progress on site 
- The kit includes everything you need (minus foundation items listed below) to progress the build to a fully locked up, weatherproof stage 
- We do not supply any of the materials for the concrete foundations or footings 
- We do not supply any of the materials for a timber subfloor, we supply from joist level upwards 
- You will generally need to allow for a Hiab truck or similar to help lift and place the timber portals 
- Specific engineering design is always a part of our projects and consequently there will be a handful of inspections required by an approved engineer throughout the build, either yourself or the owner will be responsible for organizing these inspections 
 
        
        
      
    
    Builders Pack
- Includes a full set of approved building consent drawings, with additional notes, markings and colour coding to guide you in the kit assembly 
- Panel drawings identifying the location of coded items 
- Schedule of all materials supplied, including hardware and its specific use 
 
        
        
      
    
    What’s Included In The Kit
All kits will include:
- feature beams - LVL portals, exposed trusses 
- timber accessories – decorative louvres, exterior barn doors and cupolas 
- hardware to assemble all items listed 
- decks supplied from joists upwards 
- timber framed floors supplied from joists upwards 
- exterior and interior precut / prenail wall framing 
- roof framing, includes any trusses and ceiling strapping 
- random timber for cutting and fitting on site where appropriate 
- wall and roof building wraps with rigid barrier when and if required 
- exterior cladding with a cavity batten system for habitable buildings 
- Colorsteel roofing and associated flashings 
- Marley Stratus uPVC Design Series coloured spouting and downpipes, colorsteel if requested 
- sectional and roller doors, supplied with automatic openers and remotes 
- aluminium joinery (Vantage or First) a minimum of Low E, Argon filled double glazing for habitable buildings (a Thermal System can be supplied if requested or required) 
Didn’t find what you were looking for?
Give us a call, we’re more than happy to answer any questions you may have 0800422548
 
                         
            
              
            
            
          
               
            
              
            
            
          
               
            
              
            
            
          
               
            
              
            
            
          
               
            
              
            
            
          
              